Esta notícias foi vista64vezes!

Unilog Ferrovia was the system the Nacala Corridor operation used to monitor trains, rolling stock and performance indicators. However, on the 23rd of August, this system was replaced by the GPV Ferrovias. The replacement of the operating system had as main motivators the mitigation of risks caused by technological obsolescence, simplification of functionalities, reduction of costs, internationalization and performance improvement, correction of the interface with the GPV Ports.

The main benefits planned for this project were: To promote robustness to the environment with a technologically updated platform; improve performance and usability by reducing typing time; improving the quality and reliability of indicators; standardize the graphical interface; reduce time and cost for deployment in other nationalities; internationalize and regionalize the system; freedom to use the system in different languages ​​and spindles; to justify the events of trains, wagons and locomotives; provide interfaces with other systems related to the railway business such as the GPV Ports and Train Licensing System. In addition, all data from the previous system were migrated to GPV Railways providing the continuity of rail operation activities in the new system.”The GPV is a tool that has increased the efficiency of the processes of control of the railway network, guaranteeing a better efficiency and reliability in our management. We are aligning ourselves with the most modern in the world in this area, “says Mário Moura, Executive Director of CDN / CEAR Operations.All data from the previous system were migrated to GPV Railways provided the continuity of rail operation activities in the new system.   For the implementation of GPV Ferrovias in the Nacala Corridor, eighty-two people were trained in several locations.